CSG Facility Shutdown Services

Our client was faced with an expedited planning schedule to meet shutdown planning gateways for works to be carried out on a CSG Central Processing Plant (CPP) and Gas Sales Station. The shutdown works were required to lift the Maximum Operating Pressure (MAOP) of the CPP discharge header and associated pipeline to overcome a pressure restriction occurring in early 2016 as production was maximised to supply 2 LNG trains. The impact for the client was limited production from the CPP if the delivery pressure was not increased.

CSG Facility Shutdown Services