Spring Gully

Supply 5000pt Citect License. Setup Virtual Machine complete appropriate licensed/ activated software and install on net...

View Project
22 June 2020

Spring Gully

Supply 5000pt Citect License. Setup Virtual Machine complete appropriate licensed/ activated software and install on network.

READ MORE

Talinga Pond D&C

Review post FAT work packages/software configuration, Stardom & Citect packages for Pond D & and Pond C including hand-o...

View Project
22 June 2020

Talinga Pond D&C

Review post FAT work packages/software configuration, Stardom & Citect packages for Pond D & and Pond C including hand-over from Control Engineer.

READ MORE

Origin ICCE Eng new po

Works done on the Spring Gully Obsolescence Program include: review of design documentation, including loops, terminatio...

View Project
22 June 2020

Origin ICCE Eng new po

Works done on the Spring Gully Obsolescence Program include: review of design documentation, including loops, terminations, general arrangements, C&E’s and P&ID’s and additional documentation requ...

READ MORE

WOPA Phase 2 & 3

Phase 2 included manufacturing of gear trays for Well Site Control Panels, fabrication of piping spools and the procurem...

View Project
22 June 2020

WOPA Phase 2 & 3

Phase 2 included manufacturing of gear trays for Well Site Control Panels, fabrication of piping spools and the procurement of bulks and miscellaneous.

READ MORE

QGC- FHA Assessment

Supply & installation of 1 x pressure and 1 x vibration data logger on five selected wellsites.

View Project
22 June 2020

QGC- FHA Assessment

Supply & installation of 1 x pressure and 1 x vibration data logger on five selected wellsites.

READ MORE

Jemena Metsolv Windsor

Engineering services for a metering package, including design services for the Windsor meter upgrade Project.

View Project
22 June 2020

Jemena Metsolv Windsor

Engineering services for a metering package, including design services for the Windsor meter upgrade Project.

READ MORE

Horsley Park

Supply and Installation of Swagelok Instrument tubing in existing cable tray and installation of Swagelok tubing support...

View Project
22 June 2020

Horsley Park

Supply and Installation of Swagelok Instrument tubing in existing cable tray and installation of Swagelok tubing support systems and associated.

READ MORE

Jemena- West Hoxton

Design of the odorant analyser, weather proof enclosure it comes supplied with as well as the sunshade and supplied cali...

View Project
22 June 2020

Jemena- West Hoxton

Design of the odorant analyser, weather proof enclosure it comes supplied with as well as the sunshade and supplied calibration gas bottle at the West Hoxton facility.

READ MORE

Jemena Hoskintown

Evaluation, planning, engineering, commissioning and management of the Hoskinstown CTS station upgrade E&I works.

View Project
22 June 2020

Jemena Hoskintown

Evaluation, planning, engineering, commissioning and management of the Hoskinstown CTS station upgrade E&I works.

READ MORE

Jemena Smithfield Visy

PSA Engineering to supply Exe Junction Box to cater for 2 off 8 pair and 1 pair instrumentation cable, along with 1 pair...

View Project
22 June 2020

Jemena Smithfield Visy

PSA Engineering to supply Exe Junction Box to cater for 2 off 8 pair and 1 pair instrumentation cable, along with 1 pair Modbus cable.

READ MORE

Network Security

SCADA Network Security Assessment.

View Project
22 June 2020

Network Security

SCADA Network Security Assessment.

READ MORE

Helensvale Microwave Link

Inspection, installation &commissioning of Ceragon Microwave radios and auxiliary equipment, realignment of microwave di...

View Project
22 June 2020

Helensvale Microwave Link

Inspection, installation &commissioning of Ceragon Microwave radios and auxiliary equipment, realignment of microwave dishes from 2x sites.

READ MORE

Emerson Santos CS3 Eng

Engineering Support.

View Project
22 June 2020

Emerson Santos CS3 Eng

Engineering Support.

READ MORE

Comdain Hoskintown

Supply of OEM Instrument tubing/Installation equipment items for the Jemena Hoskinstown facility.

View Project
22 June 2020

Comdain Hoskintown

Supply of OEM Instrument tubing/Installation equipment items for the Jemena Hoskinstown facility.

READ MORE

Mereenie PLC Upgrade – Materia

Software engineering and testing, hardware procurement, equipment assembly, installation and commissioning of the upgra...

View Project
22 June 2020

Mereenie PLC Upgrade – Materia

Software engineering and testing, hardware procurement, equipment assembly, installation and commissioning of the upgraded PLC 5 at CPL’s Mereenie CTP.

READ MORE

Mereenie PLC Upgrade

Engineering associated with the hardware obsolescence upgrade of PLC 5 at CPL’s Mereenie CTP.

View Project
22 June 2020

Mereenie PLC Upgrade

Engineering associated with the hardware obsolescence upgrade of PLC 5 at CPL’s Mereenie CTP.

READ MORE

CP Mereenie PLC Refresh

Engineering, procurement, installation and commissioning of the consolidated PCS.

View Project
22 June 2020

CP Mereenie PLC Refresh

Engineering, procurement, installation and commissioning of the consolidated PCS.

READ MORE

Mereenie Tricon Upgrade

Hardware and software upgrade and replacement of ESD System Logic Solver at Mereenie Central Plant.

View Project
22 June 2020

Mereenie Tricon Upgrade

Hardware and software upgrade and replacement of ESD System Logic Solver at Mereenie Central Plant.

READ MORE

CP ESS Solenoid Valve Rep

Recommend replacement solenoid valves for 8 off valves specified by CPL1..

View Project
22 June 2020

CP ESS Solenoid Valve Rep

Recommend replacement solenoid valves for 8 off valves specified by CPL1..

READ MORE

CP E&I Techs

BECGS Facility - Tri-ethylene Glycol Package evaluation/engineering. Dingo 2 Wellsite Facility - Water Bath Heater Packa...

View Project
22 June 2020

CP E&I Techs

BECGS Facility - Tri-ethylene Glycol Package evaluation/engineering. Dingo 2 Wellsite Facility - Water Bath Heater Package evaluation/engineering.